Study A / Permit costs
$1,081 to $1,575
to permit the same $60,000 kitchen remodel, across 14 metro cities with a 2025 or 2026 schedule. The most expensive city charges 1.46 times the cheapest.
Corcoran $1,081Apple Valley $1,575
Kitchens and additions / Plymouth, Minnetonka, Wayzata
Find a Minnesota remodeler who fits your project, budget, and timing. Start with where you are. Each path ends in a next step, not a lead form.
Decide how big the project is, then see what the permit adds in your city.
See which firms name your kind of project and city, what we could confirm, and what to ask.
Line the bids up so scope, allowances, fees and payments match, and see what is missing.
Study A / Permit costs
$1,081 to $1,575
to permit the same $60,000 kitchen remodel, across 14 metro cities with a 2025 or 2026 schedule. The most expensive city charges 1.46 times the cheapest.
Corcoran $1,081Apple Valley $1,575
Study B / What remodelers disclose
1 of 28
remodelers state a minimum or starting budget on their own site. 20 show a license number, and 9 mention a design fee.
Each box is one firm. Colored boxes state a minimum.
Both are counts from public pages, with the date and the page for each. They say nothing about workmanship, and neither ranks a firm.
16 firms name this work and place on their own site. A to Z, not ranked.
This reflects what firms say on their own sites, not whether they would take your job.

Coverage ledger
The goal is current minimums and availability. Here is how much of that exists so far, counted from the data behind this page.
How the checks work, and what a check cannot tell you
Illustrative image, not a listed contractor's work. Credit: Kurt Kaiser, CC0 1.0. All credits
Pick the Cost vs. Value project closest to your scope, start from its Minneapolis job cost, add a 20 percent reserve, then ask your city for its permit fee, because the report's figures are a starting point and not a quote.
Ask your city what you are allowed to build on your lot before you spend on drawings, then budget from a Minneapolis Cost vs. Value addition figure plus a 20 percent reserve, because setbacks, frost depth and winter timing can change both the size and the price.
Before any site visit, get the license number and look it up yourself, get the minimum project size, the name of the person who runs the job, an insurance certificate from the agent, and who pulls permits. Stop the process if the firm refuses any of these or asks for substantial payment before work.
Do not compare totals until every bid names the same materials, states each allowance in dollars and lists what it excludes. Raise all bids to the same allowance level, add priced exclusions, then choose among the remaining bids on schedule, warranty, waiver practice and references.
Choose design-build if you want one firm responsible for design and construction, you accept committing to that firm early, and the contract says in writing what the design fee is, whether it is credited, and who owns the drawings. Choose a separate designer and general contractor if you want drawings you own and several firms pricing the same plans.
Look up the license number on the DLI site yourself, confirm the contract has the statutory contents, get in writing who pulls each permit and who pays each fee, and treat any permit fee figure as an estimate until your city calculates it from your valuation.
If water is coming in now, stay off the roof, protect the inside, call your insurer, and hire a licensed pro who removes ice with steam. Then fix the cause: book an energy audit with a blower door before you buy insulation, a new roof or roof vents.

Illustrative image, not a listed contractor's work. Credit: Historic American Buildings Survey (architect Monroe Sheire, original drawing), Public domain (no known restrictions, Library of Congress HABS). Cropped. All credits
Wayzata depot, Wayzata, Minnesota

Documentary photo of the place named. Credit: TheRoadDudeMN, CC BY-SA 4.0. All credits
These cities share one directory here rather than three copies of a page. Where they do differ, it can change what you ask a contractor.
Homeowners may get a permit only for homesteaded property, and they acknowledge they will personally do all of the work (as first read on 2026-11-06; the city site blocked our recheck, so confirm with the city). City page
Additions need a plot plan based on a current survey plus scaled plans (as first read on 2026-11-06; the city site blocked our recheck, so confirm with the city). City page
Building, HVAC and plumbing inspections are scheduled only through Metro West. City page