Skip to content
MNRenovate

Tool / Bids

Put your bids side by side

Three bids rarely cover the same work. Enter what each one says and see where they differ and what is missing before you compare the totals.

Sheet
T-2
Set
MNRenovate
Scale
Not to scale

This worksheet runs in your browser. What you type is saved only on this device and is never sent to MNRenovate. It is not legal advice.

Bid 1

Copy or summarize what the bid says it will do: demolition, cabinets, counters, electrical, plumbing, flooring, paint.

Placeholder amounts for items you pick later, such as tile or fixtures.

Design, permit or engineering fees the bid charges on top.

Bid 2

Copy or summarize what the bid says it will do: demolition, cabinets, counters, electrical, plumbing, flooring, paint.

Placeholder amounts for items you pick later, such as tile or fixtures.

Design, permit or engineering fees the bid charges on top.

Bid 3

Copy or summarize what the bid says it will do: demolition, cabinets, counters, electrical, plumbing, flooring, paint.

Placeholder amounts for items you pick later, such as tile or fixtures.

Design, permit or engineering fees the bid charges on top.

What you type stays in this browser on this device. Nothing is sent to us.

Side by side

Nothing to compare yet

Enter a firm name or a price in any bid above and the comparison appears here.

Why allowances move the totals

The bid guide's worked example, drawn: three made-up bids, each raised to the highest allowance.

Bid ABid A work outside allowances $21,770Bid A allowances $2,419Bid A allowance gap $5,763$29,952Headline $24,189 + gap $5,763Bid BBid B work outside allowances $22,766Bid B allowances $5,692Bid B allowance gap $2,490$30,948Headline $28,458 + gap $2,490Bid CBid C work outside allowances $24,545Bid C allowances $8,182$32,727Headline $32,727 · highest allowanceHeadline spread $8,538Matched $2,775
  • Priced work
  • Allowances in the bid
  • Gap to the highest allowance

Three bids before and after matching allowances

Chart · to scale · illustration, not a quote

None of the three bids is real. The anchor is the national 2025 Cost vs. Value job cost for a midrange minor kitchen remodel, $28,458; the spreads (85, 100 and 115 percent) and allowance shares (10, 20 and 25 percent) are assumptions. Raising every bid to the highest allowance cuts the spread from $8,538 to $2,775.
Show the numbers as a table
BidHeadline totalAllowancesGap to highest allowanceAdjusted total
Bid A$24,189$2,419 (10%)$5,763$29,952
Bid B$28,458$5,692 (20%)$2,490$30,948
Bid C$32,727$8,182 (25%)$0$32,727

What the Minnesota sources say

Provenance

How this was made

Primary sources
Date checked
Method
Each flag comes from a rule or a piece of official guidance on the sources above, and links to it. The checks run in your browser on what you enter. Thresholds that turn a number into a question (a deposit above 20% of the price, a bid more than 20% under the others, allowances above 25% of the price) are our prompts to ask, not legal limits.
What is still unknown
  • Whether a Minnesota rule outside chapter 326B limits down payments. We did not find one.
  • Whether a firm's license number belongs to the firm named on the bid. Only DLI's lookup can tell you.
  • How your city values the project and which permits it needs.
Spot a mistake?
Tell us at rice.john.nextgenai@gmail.com. We review every correction and, when the record supports it, fix the page and date the change.